Strickland Wetland Mitigation Concept Design

Dubin Environmental partnered with Green Earth Operations on the permitting feasibility analysis and wetland mitigation planning for a proposed 9-acre development in Mukilteo. The property contains a surface channel and wetland that is fed by a state highway culvert. The wetland complex has limited function, and working with a wetland scientist partner, Dubin Environmental evaluated local hydrology, topography, and vegetation to identify parts of the property that could support enhanced wetland function while preserving opportunities for site development. Dubin Environmental also led the existing utility review, setback and permitting requirement analysis, onsite and offsite wetland mitigation options, outreach to municipal review staff, and supervised the development of the concept design.

Services: Drainage Analysis, Restoration Design